Project Description

1.                The Scope of the Project

 

The Project under the Contract is upgrading and construction of Wunrok – Mayenabun – Abyei and Town Roads (88.06km), with a total estimated length of 88.06 Km, and the scope of works shall include and not limited to the following:

  • Mobilization
  • Site Establishment
  • Survey and Checking of Design Works
  • Clearing and Grubbing
  • Preparation of the Existing Surface
  • Subgrade Works
  • Subbase (Gravel Surfacing) Works
  • Drainage Structures
  • Traffic Management Works
  • Miscellaneous Works

Background of the project

Route B38 between Wau and Abyei at the North Sudan border (a distance of about 322km ) is a significant corridor which connects Wau city as the market and Warrap state overall with the neighboring country of North Sudan. Ninety-five (95%) percent of border cross and inter urban transportation is in this area is borne by road traffic. The improvement of low density of pavement road condition (the paved road length compared with the total length of road in km, approximately the ratio is less than 15.8%. and the road is in poor physical condition. Which needs an urgent Rehabilitation.

Project Details

Client Government of South Sudan
Architect AMUK & EUROAMERICAN